Specify and Machine Mating Surfaces
While the Central Manifold Ends (Cornell drawing 6058-031 REV A) will be
manufactured by Cornell and supplied
to the vendor, two noted mating surfaces must be tailored to match the
beryllium machined tubes. It is the responsibility of the vendor to specify
the amount of stock to leave on these surfaces and to perform the final
machining to dimensions that will insure a good electron beam weld.
Last modified: Wed Jan 17 17:00:50 EST 2001